Kibera Housing Initiative
Overview
The Kibera Housing Initiative is KDC’s flagship in-place redevelopment programme, replacing informal, unsafe structures with durable, low-rise housing built around the communities already living there. Rather than clearing settlements and relocating residents elsewhere, the programme is phased block by block, so families move directly from their existing homes into new units nearby.
Each housing block is designed with shared courtyards, ground-floor retail space for existing traders, and access to water, sanitation, and power from day one — treating housing as the anchor for wider neighbourhood upgrading, not a standalone building project.
Objectives
1
Deliver affordable, durable housing
Replace informal structures with permanent, weatherproof homes at price points existing residents can genuinely afford, through rent-to-own and subsidised financing.
2
Keep communities together
Redevelop in place and in phases, so residents move once — directly from their current home into a new unit — rather than being displaced during construction.
3
Protect existing livelihoods
Build ground-floor commercial space into every block so shopkeepers and traders currently operating from informal structures retain their customer base.
4
Integrate essential services
Connect every unit to piped water, sanitation, and metered power at handover, instead of treating utilities as a later add-on.
Impact
12,500+
Homes to be built
85,000+
Residents rehoused
4
Construction phases
600+
Ground-floor trading units
Investment
Community Benefits
Formal tenure. Residents gain documented occupancy or ownership status for the first time.
Lower living costs. Metered utilities replace informal vendors, cutting water and power costs for most households.
Reduced disaster risk. Fire-resistant materials and proper drainage sharply cut exposure to the fires and floods common in informal housing.
Protected trade. Built-in commercial units let existing shopkeepers stay on the same street they’ve always worked.
Shared public space. Courtyards and walkways designed for community life, not just circulation.
Construction-linked jobs. Local hiring targets on every phase of the build.
Timeline
2024–2025
Phase 1 — Foundation blocks
Community mobilisation, land and tenure agreements, and construction of the first housing blocks and utility connections.
2026–2028
Phase 2 & 3 — Scaled delivery
Rolling handovers across the majority of planned units, alongside commercial space fit-out and rent-to-own enrolment.
2029–2032
Phase 4 — Completion & handover
Final blocks delivered, remaining households transitioned, and long-term facilities management handed to resident associations.
2033 & beyond
Ongoing stewardship
Maintenance, resale/rent-to-own conversions, and lessons applied to the next KDC housing programme.
Be part of Kibera's transformation
Whether you are an investor, development partner, community organization, business, or institution, there is a role to play in building Kibera’s next chapter.